Takt time
Takt time is the pace production must hold to match customer demand: available production time divided by units of customer demand for the same period.
What it is
See it move
Loading infographic...
A workshop operates 450 minutes a day and customers demand 90 units a day. Takt time is 450 ÷ 90 = 5 minutes per unit — the pace the line must hold to keep up with orders. If the line's measured cycle time is 6 minutes per unit, it is running slower than demand requires; at 4 minutes, it has slack capacity.
The formula
LaTeX
Variables
- Available production time (minutes)
- Customer demand (units) for the same period (units)
Gives the pace, in time per unit, that production must hold to exactly match customer demand for the period.
Check yourself
PracticeCORE
A packing line runs for 384 minutes a day and must meet daily customer demand of 96 units. What is the takt time?