Valor Actual Neto (VAN)

Descuenta una serie de flujos de caja a hoy para ver si el proyecto crea valor.

The NPV calculator discounts a series of future cash flows back to today at your chosen rate and sums them with the initial investment, showing whether a project creates or destroys value.

Introduce un porcentaje entero — por ejemplo 10 para 10%.

Separa los valores con una coma o un salto de línea

El primer valor es la inversión inicial (negativo); cada valor siguiente es el flujo neto de ese período.

Valor actual neto243 €
Flujo de caja total sin descontar500 €
Número de períodos3

Ejemplo resuelto

Usando los valores anteriores:

Tasa de descuento
1000,0 %
Flujos de caja
-1000 €, 500 €, 500 €, 500 €
Valor actual neto243 €
Flujo de caja total sin descontar500 €
Número de períodos3

The formula

LaTeX
NPV=t=0nCFt(1+r)tNPV = \sum_{t=0}^{n} \dfrac{CF_t}{(1+r)^t}

Variables

Cash flow at period t ()
Discount rate (%)
Period number (0, 1, 2, …)
Final period

What net present value means

Net present value (NPV) converts a series of future cash flows into a single number in today's euros. A euro next year is worth less than a euro today — it could have been earning a return in the meantime — so NPV discounts every future cash flow back to the present at a rate that reflects what your money could otherwise earn, then adds the results together along with the upfront investment (entered as a negative cash flow).

The result tells you directly whether a project creates value: positive NPV means the project is expected to earn more than your discount rate; negative NPV means it's expected to earn less. It's the workhorse metric of capital budgeting and shows up any time an exam question gives you a stream of projected cash flows and asks whether to invest.

How to calculate it

  1. Lay out every expected cash flow by period, starting with period 0 — the initial investment, entered as a negative number.
  2. Discount each period's cash flow back to today by dividing it by (1 + rate) raised to the power of the period number.
  3. Add every discounted cash flow together, including the (already negative) period-0 investment. The sum is the NPV.
  • The discount rate should reflect your required return or cost of capital — a higher rate discounts future money more aggressively.
  • NPV assumes cash flows arrive at the end of each period and that the discount rate stays constant across the whole horizon.
  • A larger, positive NPV at the same discount rate means more value created, all else equal — but NPV in euros isn't directly comparable across projects of very different sizes (see the limitations below).

A worked example

Take a project needing €1,000 upfront, expected to return €500 at the end of each of the next three years, evaluated at a 10% discount rate. Discounting each €500: €500 ÷ 1.10 ≈ €454.55 in year one, €500 ÷ 1.10² ≈ €413.22 in year two, €500 ÷ 1.10³ ≈ €375.66 in year three. Adding those three discounted values (≈ €1,243.43) to the −€1,000 initial investment gives an NPV of approximately €243 — a positive result, so the project is expected to outperform the 10% hurdle rate.

Limitations to know

NPV in euros isn't directly comparable between projects of very different scale — a €10,000 project with €500 NPV and a €10,000,000 project with €500 NPV are not equally attractive, even though the number matches. NPV is also only as good as its inputs: the discount rate and every projected cash flow are estimates, and small changes to either can flip the sign of the result for a project that's close to break-even.

Preguntas frecuentes

Use your required rate of return, or cost of capital, for the type of project — usually WACC for a company investment, or a personal hurdle rate for individual decisions. A higher rate discounts future cash flows more heavily, so a riskier project needs a higher rate to compensate for that risk.