Manufacturing cycle efficiency

Manufacturing cycle efficiency (MCE) is process (value-added) time divided by total manufacturing cycle time, showing what share of production time actually adds value versus waiting, moving or inspecting.

ByHoang TruongUpdated

See it move

Loading infographic...

A batch spends 16.0 hours in the factory, but only 4.0 of those hours is process time that actually transforms the product. The remaining 12.0 hours is inspection, move and queue time. Manufacturing cycle efficiency is 4.0 ÷ 16.0, or 25% — three-quarters of the time is waste.

Where it fits
SubjectManagerial AccountingCoreTopicStrategic Performance & the Balanced ScorecardCore

The formula

LaTeX
MCE=TprocessTMCMCE = \dfrac{T_{\text{process}}}{T_{\text{MC}}}

Variables

Manufacturing cycle efficiency
Process (value-added) time (hours)
Total manufacturing cycle time (hours)

The share of total cycle time that is genuinely value-added; closer to 1.0 (100%) means less waste from waiting, moving and inspecting.

Check yourself

PracticeCORE

A batch spends 6 hours in process time, 2 hours in inspection, 4 hours in move time, and 18 hours in queue time. What is the manufacturing cycle efficiency for this batch?

Select an answer to check your understanding.